Cement guy's truck broke down. Looks like the wall forms will be delayed another few days. In the meantime Joe put in an O-pipe to the lake with a backflow valve (so that if the place floods the water can drain to the lake). He also had the rebar put in and it passed inspection.
No comments:
Post a Comment